Hitachi Energy Hong Kong Limited
Hitachi Energy is a global technology leader that is advancing a sustainable energy future for all. We serve customers in the utility, industry and infrastructure sectors with innovative solutions and services across the value chain. Together with customers and partners, we pioneer technologies and enable the digital transformation required to accelerate the energy transition towards a carbon-neutral future. We are advancing the world’s energy system to become more sustainable, flexible and secure whilst balancing social, environmental and economic value. Hitachi Energy has a proven track record and unparalleled installed base in more than 140 countries. Headquartered in Switzerland, we employ around 40,000 people in 90 countries.
Hitachi Energy's partnership with China dated back to more than 100 years ago. The company set up its first office in Beijing in 1979. After over 40 years of development, Hitachi Energy has deeply rooted in China with a full range of business activities, including R&D, consulting, sales, engineering, manufacturing, and services. It has 16 local companies, 27 branches, and over 5,000 employees across 50 cities.
Hitachi Energy has actively involved in multiple milestone projects in China with its leading technologies and solutions, including Xiangjiaba-Shanghai, the first ±800 kV ultra-high-voltage direct current (UHVDC) link of State Grid Corporation of China (SGCC); Changji-Guquan, the world’s first ±1,100 kV UHVDC transmission link with new records on voltage level, transmission capacity and distance; Sutong tunnel, the world’s first UHV GIL to transmit power under the Yangtze River; the world’s first VSC-HVDC grid in Zhangbei; and Baihetan-Jiangsu, the world’s first series hybrid UHVDC project. The company also provided key technologies to China’s first “zero-carbon” substation of SGCC, and China’s first offshore floating wind turbine in Guangdong Province.
Hitachi Energy's advanced digital solutions enable customers to overcome complexities brought by the energy system, to enhance grid capacity, and to optimize energy efficiency management. Its leading Lumada Asset Performance Management (APM) has served multiple grid and industrial customers in China. Hitachi Energy supported China Southern Grid (CSG) and China Huaneng (Zhejiang) to set up VPP, the latter of which marks the first one in China that is integrated in the power dispatching system.
Hitachi Energy fully supports the Belt and Road Initiative and joins hands with Chinese enterprises to go out. By far, the company has worked together with over 200 Chinese companies on some 1,000 projects in more than 80 countries and regions.
Hitachi Energy leads the ranking with its local companies on the list of the 2022 “China Top 100 Electrical Companies”. In addition, it won the awards of "China Electrical Companies’ Top 10 Dual-Carbon Solutions” and "China Electrical Companies’ Top 10 Digital Solutions".
In 2022 Forbes’ "Best Employers in China" selection series, Hitachi Energy was named “2022 Best Employer”, and won the “2022 Most Sustainable Employer” award.
As a registered Electrical Contractor, we have already successfully obtained the ISO 9001 certificate to conform to the Quality Management System, ISO 14001 certificate to confirm to the Environmental Management system and the ISO 45001 certificates to the Occupational Health and Safety Management System. To date, Hitachi Energy Hong Kong Limited is one of the major suppliers of key utilities – CLP, HKE, MTR, CEM … etc. for Hong Kong & Macau’s infrastructure projects. Hitachi Energy positions itself not only as a reliable and professional expert in quality products and services as well as integrated energy solution package but also as an enterprise with environmental concerns.
Contact us
Edwin Lui Business Unit Grid Integration - Grid Integration Products
[email protected]
Dominic Tse Business Unit Grid Automation - Grid Automation Products
[email protected]
Address: Units 917-918, 9/F, Delta House, 3 On Yiu Street, Shek Mun,
New Territories, Hong Kong
Tel: +852 2929 3902
Fax: +852 2929 3883
Email: [email protected]
Project references: Hong Kong & Macau Region
Grid Integration
- CLPP – 400kV GIS projects in Power Plant
- CLPP – 11kV Line Arrester
- HKE – 22kV GIS replacement projects
- HKE – Shunt reactor and transformer projects
- HKAA – Transformer projects
- MTRC – Transformer projects
- WSD and DSD – Transformer projects
- CEM – 110//11kV Turnkey Substation Projects since 2003
- CEM – 110kV GIS retrofit/extension projects
- CEM – 11kV Close Ring Projects (Customer substation) since 2012
- CEM – 11kV Distribution transformer Projects
- CEM – 11kV Ring Main Units Projects
- CEM – Monoblock projects
- Galaxy Resort – 110/11kV Turnkey Substation
- Galaxy Resort – Substation Maintenance projects
- Other Industries – 11kV Distribution transformer projects
Grid Automation
- CLPP – IPACS (Intelligence Protection Automation Control Supervision) for 132/11kV Project
- CLPP – MVRTU (Remote Terminal Unit) for Customer Substation Project
- CLPP – Wired Communication Products (Tele-protection, AC Modem and XMC25)
- HKE – HVRTU (Remote Terminal Unit) for Retrofit Project
- HKE – Protection Relay for 11/22kV Replacement Project
- HKAA – HVSCADA, Protection & Control Relay for T1 Replacement Project
- HKAA – HVSCADA, Protection and Control for APM Project
- HKAA – HVSCADA, Protection and Control for BESS Project
- CEM – SCADA, Protection & Control Relay for 11kV Close Loop Customer Substation Project
- CEM – SCADA, Protection & Control Relay for 110/11kV Türkiye Substation Project
- CEM – HVRTU (Remote Terminal Unit) for 110kV Replacement Project
- Galaxy Resort – SCADA, Protection & Control Relay for 110/11kV Türkiye Substation Project
- CLPP – AHMS Solution (Asset Health Management System)